On 3/25, from 6 am to 8 am, contractors and facilities will be making changes to an electrical panel on the 2nd fl. that supplies power to Lab air, Air tables, and Cage washing equipment.
On 3/25, from 6 am to 8 am, contractors and facilities will be making changes to an electrical panel on the 2nd fl. that supplies power to Lab air, Air tables, and Cage washing equipment.