On 4/18 from 6:30 am to 6:30 pm, Air Handler 2, which serves the 1st and 3rd floors, will be shut down to facilitate a contractor installing a new air filtration system. During this outage, there will be no airflow, heating or cooling capabilities
On 4/18 from 6:30 am to 6:30 pm, Air Handler 2, which serves the 1st and 3rd floors, will be shut down to facilitate a contractor installing a new air filtration system. During this outage, there will be no airflow, heating or cooling capabilities