Outages

4/7: Planned Service Interruption – BJC Institute of Health (BJCIH), Compressed Air

On 4/7, from 3 am to 7 am, Facilities technicians and contractors will be performing upgrades to the laboratory air compressor system. As a result, laboratory air will be unavailable to all equipment on floors 6 through 11 for the duration of the outage.