Outages

6/13: Limited Service Interruption – South Building, Air Handling Unit

On 6/13, from 6 am to 3 pm, Air Handling Unit #3 serving the 3rd, 4th, and 5th floors will be shut down to replace the supply air variable frequency drive (VFD). During this outage, there will be no airflow, heating, or cooling capabilities. Thank you for your patience.