On 6/27, from 6 am to 4 pm, Facilities will assist contractors in cleaning the air handler serving the 6th floor. As a result, temperatures on the 6th floor may be warmer than normal during this period.
On 6/27, from 6 am to 4 pm, Facilities will assist contractors in cleaning the air handler serving the 6th floor. As a result, temperatures on the 6th floor may be warmer than normal during this period.