Outages

8/21-9/30: Planned Service Interruption – BJCIH

Starting on 8/21 and continuing through 9/30 facilities technicians will be upgrading the HVAC systems serving the B120 BSL3 suite each morning from 5 AM – 7 AM. During these times NO work shall be conducted inside the B120 suite.