On 8-8-2026 from the hours of 6:00 AM – 6:00 PM work will be performed on Air Handling Unit 3 causing pressure and temperatures to be affected on the 2nd floor of the East Building.
On 8-8-2026 from the hours of 6:00 AM – 6:00 PM work will be performed on Air Handling Unit 3 causing pressure and temperatures to be affected on the 2nd floor of the East Building.