On December 5th, from 5am to 7am, a facilities technician will be troubleshooting HVAC systems serving the 4th-floor BSL3 labs. During this time, NO work shall be conducted on the 4th floor.
On December 5th, from 5am to 7am, a facilities technician will be troubleshooting HVAC systems serving the 4th-floor BSL3 labs. During this time, NO work shall be conducted on the 4th floor.