Outages

1/29: Gary C. Werths Building at Siteman Cancer Center, Planned Service Interruption

This is a revised outage start time for the software patch of the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are any failures with the building HVAC systems.