Outages

4/8: Planned Service Interruption – 4560 Clayton (Research Building), Building Heat

On 4/8 from 6 am to 11 am, the heating water serving the East Side of the second floor will be valved off to facilitate the contractor’s repair of a leaking pipe. Occupants may notice slightly lower temperatures in the labs and office spaces. Thank you for your patience