Outages

8/9: Planned Service Interruption – Becker Medical Library, Air Handling Unit

On 8/9, from 4 am to 4 pm, Air Handler 1 will be shut down to facilitate the installation of a new air filtration system. During the outage, there will be no airflow, cooling, or heating capabilities affecting the Basement, 1st, 6th, and 7th floors. Thank you for your patience.