On 11/14, from 6 am to 10 am, contractor personnel will be replacing damaged conduits that house power cables supplying the North Building.
Due to the condition of the existing conduit, both NORMAL/EMERGENCY POWER will need to be de-energized to allow the installation of temporary power while damaged conduits are repaired.
A second power outage will be scheduled following the completion of the conduit repair to facilitate the restoration of the permanent power connections.
Please plan accordingly for the interruption to both NORMAL/ EMERGENCY power.