4511 Forest Park, Core@718, 4522 McKinley, Olin Residence Hall, Maternity Hospital, Specialized Research Facility East, East McDonnell Facility, South Medical Building

Elevators in these buildings will be out of service for 2 to 4 hours between 7:00 am and 3:30 pm, from June 2nd to June 6th. This is to conduct fire recall testing, annual, and 5-year inspections as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be […]

McDonnell Medical Sciences Building-Exhaust Fan Service Interruption 5/27-29/2025

On Tuesday, May 27th, 6 am – Thursday, May 29th, 2:30 pm. Exhaust fans 24, 25, and 27 will be shut down to assist the contractor in removing and replacing the ductwork on the roof. This will affect the building exhaust on the 8th floor, rooms 880H through 880Q, the fume hood in 880Q, and […]

CSRB North Tower Addition-Elevator Service Interruption 5/28/2025

On Wednesday, May 28th, 7 am-3:30 pm, elevator #5 will be taken out of service to allow contractors to perform final work on the fire alarm controls for this elevator. The elevator will be returned to service once the work is complete.

Wohl Hospital-Electric Service Interruption 5/14/2025

Starting Wednesday, May 14th, at 5-7 am and Friday, May 16th, at 5-7 am, facilities along with contractors will be interrupting power for an upgrade to the system. This outage will last 2 hours per day at said time. This will only affect floors 6 through 10 in Wohl Hospital. The generator will not be […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 5/14/2025

This outage will affect airflow and temperature regulation on the east side of the building. Lab spaces will have limited temperature control and can be warmer than usual. All fume hoods on the east side of the building will not have flow/exhaust and will be in an audible alarm. Please refrain from using the fume […]

CSRB North Tower Addition-HVAC Service Interruption 5/15/2025

On Thursday, May 15th, 3-6 am, the HVAC system supply and exhaust system flows may be reduced to the 4th and 5th floor vivarium and lab spaces to perform preventive maintenance. NO work shall be performed in any BSL3 lab during this time.