Elevator 102 will be out of service on Sunday, August 11, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Author: Michelle
CSRB North Tower Addition-Elevator Service Interruption 7/25/2024
Elevators 1, 2, 3 and 4 will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on June 25th, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a […]
4480 Clayton-Boiler System Service Interruption 7/22-8/2/2024
On July 22nd at approximately 5 pm there was a failure to our boiler system at the 4480 Clayton Ave. building for heating causing temperature issues. In this time there will be limited to no heating to the spaces within the building.
McDonnell Pediatric Research Building-Supply Air Unit Service Interruption 7/25/2024
On Thursday, July 25th 7-7:30 am The battery in the UPS unit that serves the controls for AHU-1 (the supply air unit that serves the BSL3 suites and labs on the west side of the building) will be replaced. The work should not impact the BSL3 suites; however, no work may occur in the BSL3 […]
CSRB North Tower Addition-4th Floor Biohazard Area Service Interruption 7/23-24/2024
On Tuesday, July 23rd 6 pm – Wednesday, July 24th 6 am In preparation for the upcoming AAALAC inspections, miscellaneous repairs will be completed in the 4th floor biohazard area. No work may occur in the 4th floor biohazard area during this outage.
4533 Clayton Ave-Domestic Cold Water Service Interruption 7/27/2024
On Saturday, July 27th 4 am – 12 pm they will be working on the Domestic Cold Water in the Bathrooms, kitchen, all potable water.
Clayton Garage-Fire Alarm Service Interruption 7/24/2024 6 am
The Fire Alarm team will be testing the speakers/horns and strobes during this time. This is only a TEST
Sidewalk at the Core @718 sidewalk closed July 29-31
The sidewalk at the Core @718 will be closed from July 29-31 to replace the stairs. See the image for the closed area. The area in red (south sidewalk and stairs on McKinley) will be closed to pedestrian foot traffic. For any questions, please contact Jarrod Rahn, Engineering Project Manager
Three parking spaces closed for fluid cooler replacement at 4488 Forest Park from July 23-26
Due to a project to replace the fluid cooler at the 4488 Forest Park Avenue Building, we are closing three parking spaces on the 4488 lot for two crane lifts from Tuesday, July 23rd, to Friday, July 26th. Please see the map, which shows the spaces that will be closed. They will have two crane […]
REVISED-McDonnell Medical Sciences Building-Emergency Shower Service Interruption 7/25/2024
On Wednesday, July 24th 8-10 am Facilities maintenance personnel will need to perform work within the McDonnell Medical Science Building, 5th Floor 562 BSL3 Lab Suite. Work includes conducting a flow test on an emergency shower in the ante room and cleaning of a light fixture within the BSL3. NO work shall take place within […]