Jeffrey T. Fort Neuroscience Research Building-Electric Service Interruption 8/26/2024

On Monday, August 26th 4 am – Noon contractors will be isolating electrical power to areas on floors 7-10. There will be some power available during the outage through receptacles on our backup power circuits. If you have questions or need more detail, please contact amanda.c@wustl.edu or davidlott@wustl.edu.

Biotechnology Center-Domestic Cold Water Service Interruption 8/16/2024

On Friday, August 16th 12-6 am Facilities Engineering will be performing repairs on the domestic waterlines for the building. This will affect all potable hot and cold water, emergency showers and eyewash stations, vacuum and any equipment that requires potable water.

Biotechnology Center-Elevator Service Interruption 8/14/2024

On Wednesday, August 14th 6 am – 5 pm as part of the elevator modernization project for elevators 51 & 52, both elevators will be out of service to allow contractors to relocate the construction barriers on each floor. During this time, please use the service elevator #31. Once the work is complete, elevator #52 […]

CSRB North Tower Addition-Air Handling Unit Service Interruption 8/13/2024

On Tuesday, August 13th 8-Midnight preventative maintenance will be being performed on the HVAC systems serving floors 4-7 . During the preventative maintenance work the floors may see a reduction in air flow to non- critical spaces. Out of an abundance of caution NO work shall take place in the 4th floor BSL3 labs during […]