On Wednesday, January 24th 7:00-8:30 am a lighting repair will be completed in 434-Animal Holding. NO work may occur in the 434/445 ABSL3 suite during this outage.
Author: Melanie
Steven & Susan Lipstein BJC Institute of Health – Elevator Service Interruption 1/25/2024
Elevator #113 will be out of service between 3:30 pm and 7:30 pm, to conduct 5-year inspections as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevator will be returned to service once all inspection work is completed.
Wohl Clinic-Elevator Service Interruption 1/25-26/2024
On Thursday, January 25th 4 pm through Friday, January 26th 7 am access to the lower level will be disabled on Elevator #16 and #17, so that contractors can install new flooring. Elevators 13, 14 & 15 can still be used if needed, during this time.
Clinical Sciences Research Building-Air Handling Unit Service Interruption 1/19/2024
On Friday, January 19th 4-7 am contractors will be turning off air handler AHU7B which serves the south side of the 7th floor. The south side of the 7th floor will experience loss of airflow and slightly cooler than normal temperatures during this time.
Installation of a new fiber optic cable between Kingshighway and Boyle
Sent on behalf of Barnes-Jewish Hospital. Beginning this week, Sachs Electric (ArchKey) began work on the Medical Campus to install a new fiber optic cable between Kingshighway and Boyle. Weather permitting, this work’s planned duration is Tuesday, January 3rd, through the close of business on Friday, January 30th. All work will be done during the […]
Extended – North Building roof replacement
From December 2nd to January 3rd, contractors will work Monday to Friday from 6 am to 2:30 pm. During this time, the south sidewalk heading west beyond Olin Residence Hall, the east Farrell Learning & Teaching Center (FLTC) entrance, and the FLTC ADA entrance will be closed due to a crane operating on the east […]
January 10 is the opening day for the renovated Plaza Gift and Flower Shop
Sent on behalf of Barnes-Jewish Hospital. The Plaza Gift and Flower Shop in the main lobby will open Wednesday, Jan. 10, at 7 a.m. following extensive renovations that started in February 2023. Stephanie Neal, Barnes-Jewish retail shops manager, says while the Plaza Shop has been thriving in its temporary space, she’s excited and can’t wait […]
Limited access to the Wohl Hospital and Wohl Clinic corridors through February
Work started the week of December 25th and is expected to go through February. There will be limited access to the corridors of Wohl Hospital and Wohl Clinic during evening hours and weekends. We will be updating and refreshing the lower-level corridors. Work will involve removing and replacing flooring, painting, ceiling tile work, replacing hardware, […]
4488 Forest Park-Fire Alarm Service Interruption 1/10/2024
On Wednesday, January 10th 7-11 am contractors/Facilities will be doing inspections of the Fire Alarm System devices during this time. During this time they should not be setting off the Audio/Visuals of the fire alarm system and will not need to leave the building.
CSRB North Tower Addition-Air Handling Unit Service Interruption 1/9/2024
On Tuesday, January 9th 5-7 am facilities technicians will be completing preventative maintenance task on the HVAC system serving the 4th floor. During this time NO work shall take place in any 4th floor BSL3 lab.