Wohl Clinic-Elevator Service Interruption 1/25-26/2024

On Thursday, January 25th 4 pm through Friday, January 26th 7 am access to the lower level will be disabled on Elevator #16 and #17, so that contractors can install new flooring. Elevators 13, 14 & 15 can still be used if needed, during this time.

Installation of a new fiber optic cable between Kingshighway and Boyle

Sent on behalf of Barnes-Jewish Hospital. Beginning this week, Sachs Electric (ArchKey) began work on the Medical Campus to install a new fiber optic cable between Kingshighway and Boyle. Weather permitting, this work’s planned duration is Tuesday, January 3rd, through the close of business on Friday, January 30th. All work will be done during the […]

Extended – North Building roof replacement

From December 2nd to January 3rd, contractors will work Monday to Friday from 6 am to 2:30 pm. During this time, the south sidewalk heading west beyond Olin Residence Hall, the east Farrell Learning & Teaching Center (FLTC) entrance, and the FLTC ADA entrance will be closed due to a crane operating on the east […]

January 10 is the opening day for the renovated Plaza Gift and Flower Shop

Sent on behalf of Barnes-Jewish Hospital. The Plaza Gift and Flower Shop in the main lobby will open Wednesday, Jan. 10, at 7 a.m. following extensive renovations that started in February 2023. Stephanie Neal, Barnes-Jewish retail shops manager, says while the Plaza Shop has been thriving in its temporary space, she’s excited and can’t wait […]

Limited access to the Wohl Hospital and Wohl Clinic corridors through February

Work started the week of December 25th and is expected to go through February. There will be limited access to the corridors of Wohl Hospital and Wohl Clinic during evening hours and weekends. We will be updating and refreshing the lower-level corridors. Work will involve removing and replacing flooring, painting, ceiling tile work, replacing hardware, […]

4488 Forest Park-Fire Alarm Service Interruption 1/10/2024

On Wednesday, January 10th 7-11 am contractors/Facilities will be doing inspections of the Fire Alarm System devices during this time. During this time they should not be setting off the Audio/Visuals of the fire alarm system and will not need to leave the building.