On Thursday, January 25th 4 pm through Friday, January 26th 7 am access to the lower level will be disabled on Elevator #16 and #17, so that contractors can install new flooring. Elevators 13, 14 & 15 can still be used if needed, during this time.
On Thursday, January 25th 4 pm through Friday, January 26th 7 am access to the lower level will be disabled on Elevator #16 and #17, so that contractors can install new flooring. Elevators 13, 14 & 15 can still be used if needed, during this time.