June 2-June 10: East McDonnell Clean East Façade

From June 2 to June 10, workers will clean the bottom limestone band of the east facade of the East McDonnell Building. Because workers will use a lift to complete this work, sections of the 4515 parking lot will be closed in phases. Here is the phasing schedule, and the dates of the phases are […]

June 2-13: New Concrete Light Pole Bases Installed on Euclid Avenue

An electrical contractor will be installing new concrete light pole bases along Euclid Avenue the week of June 2nd. The new cobra-head light poles will then be installed the week of June 9th. Barricades will block off the required areas for construction on Euclid and the sidewalks. One light is at the northeast corner of […]

May 30-June 13: Medical Campus Street Work Notification on Taylor Avenue

Sent on behalf of Barnes-Jewish Hospital. Starting May 30, Archkey began working on the Medical Campus to conduct WashU Medicine cable pulling activities on Taylor Avenue between Forest Park and Duncan and the 4400 block of Duncan Ave. Please see the work location. Weather permitting, the planned duration of this work is on Friday, June […]

Locker/Shower Room Reminder for Those Impacted by Recent Storms

As the St. Louis area continues to recover from the recent storms, we want to remind all WashU Medicine employees and students, especially those who may have been directly impacted, that locker and shower facilities on campus remain available for your use. These amenities can be helpful if you are experiencing disruptions at home. If […]

WashU Medicine Campus Store – St. Louis Area, American Red Cross Donations

The WashU Medicine Campus Store (MCC, 1st floor) will be accepting donations to the St. Louis Area American Red Cross. Students, faculty, staff and visitors are welcome to stop by and make a donation at the point-of-sale system, with or without a campus store purchase. Bear Bucks are accepted as a form of payment for […]

WashU Medicine Campus Store – St. Louis Area, American Red Cross Donations

The WashU Medicine Campus Store (MCC, 1st floor) will be accepting donations to the St. Louis Area American Red Cross. Students, faculty, staff and visitors are welcome to stop by and make a donation at the point of sale system, with or without a campus store purchase. Bear Bucks are accepted as a form of […]

May 20-August: Barnard Exhaust Fan Replacement

Bernhard Engineering/ENFRA will begin investigating the entire Barnard exhaust fan #3 system throughout the building. This will consist of an ENFRA/Bernhard Engineer walking around the whole building and following the ductwork through the ceilings to create an as-built of the system. They will remove ceiling tiles and look above the ceilings as needed throughout the […]

May 20-June 9: BJCIH Utility Vault Roof Drain Routing on Euclid Avenue

Starting at 5 am on May 20th, Tarlton will begin work to route the new roof drain lines from the BJCIH utility vault to the city sewer system. This project includes saw cutting and removing a section of sidewalk and roadway along Euclid Avenue near the Central West End MetroLink. The saw cutting will occur […]

St. Louis Children’s Hospital (SLCH) Construction Updates

Sent on behalf of Barnes-Jewish Hospital. At any given time, dozens of construction projects are taking place throughout the St. Louis Children’s Hospital and campus—some you see, many you don’t. Renovations, upgrades and new construction are needed to accommodate new technology, enable departments to operate more efficiently, and, most importantly, create the most comfortable environment […]