Multi-carrier Distributed Antenna System Group A@ CAM update

Sent on behalf of Barnes-Jewish Hospital. A Multi-carrier Distributed Antenna System (MDAS) will be installed over the next18-24 months to provide cellular service for ATT, Sprint-T-Mobile, and Verizonconnections throughout the Medical Center Campus. The construction will becompleted in phases targeting specific building groups. What’s happening in your building?Construction in Center for Advance Medicine will run […]

Multi-carrier Distributed Antenna System Group K update

Sent on behalf of Barnes-Jewish Hospital. A Multi-carrier Distributed Antenna System (MDAS) will be installed over the next 18-24 months to provide cellular service for ATT, Sprint-T-Mobile, and Verizon connections throughout the Medical Center Campus. The construction will be completed in phases targeting specific building groups. Current Status:Construction in the following five buildings is complete: […]

600 South Taylor patient lot (TAB West) now open

The 600 S. Taylor (TAB west) patient lot is now open as of June 9th. The lot will be power washed and striped. The tentative date for power washing is Tuesday, June 15th in the late evening/night. The lot will be striped after it dries (date to be set). These will be different nights and […]

WUSM Mail stop codes

The University is shifting from Campus Box (CB) numbers to Mail Stop Codes (MSC). Each person has a unique mail stop code that is comprised of the campus box number, building number and floor or suite number. To determine your MSC, please visit the Mail Services website. To learn more about why the University is […]

Queeny Tower demolition hours extended

Sent on behalf of Barnes-Jewish Hospital. Beginning June 16, Queeny Tower demolition hours will be extended. Contractors will be on site from 6 a.m. to 11 p.m., Monday-Saturday. Since the removal of the rooftop equipment, the pool and the bridge connecting Queeny Tower and West Pavilion, demolition has accelerated. Watch demolition here. Windows along the […]

Portion of Taylor Avenue and alley behind East Imaging to be repaved this week

Today (June 1), the portion of Taylor Avenue disrupted for the research building steam line installation south of the Metrolink tracks will be repaved (see diagram). This work will be done in phases to maintain two-way traffic on this street. Also, the alley to the west of this location (behind East Imaging) will be repaved […]

Crane Lift at 4444 Forest Park alley on Saturday, June 5th

A crane lift will be set up at 4444 on Saturday June 5, (weather dependent) to set a new air handler in the new penthouse. Please see Crane Lift Plan. The crane will be located in the alley on the west side to reach the west portion of the roof. For any questions, please contact […]

Newstead Street Closure

A portion of Newstead Avenue south of Duncan Avenue will be closed starting June 14th, until the end of December 2022 to facilitate the construction of the neuroscience research building and associated overhead pedestrian link above Newstead Avenue. A professional traffic analysis has been completed to ensure the viability of this closure. The detour and […]

Clayton garage west side ramp closed from 4th level to 5th level

In order to perform inspections on the cables in the Clayton Garage, the west side of the ramp on the fourth and fifth floors will be blocked until the inspection and possible repair is completed. For any questions, please contact David Strowmatt, Facilities Supervisor.

Multi-carrier Distributed Antenna System update

Sent on behalf of Barnes-Jewish Hospital. The greater portion of the MDAS (in-building cellular system) infrastructure construction has been completed for the buildings listed below. On Saturday, June 12th, On Air Solutions (OAS) will “turn down” the existing “Sprint Only” in-building cellular system and “turn up” the new MDAS; the existing Sprint in-building cellular system […]