2/28: SRF + East, Planned Service Interruption – Exhaust Fan

On 2/28, Strobic exhaust systems 3 & 4 will be shut down to facilitate contractor repairs. This will affect all exhaust systems on the entire 2nd floor, including animal holding rooms and the 1st-floor animal holding rooms. Air pressures will be affected during this outage. Facilities will be closely monitoring temperatures/pressures during the work and […]

2/21: SRF + East, Planned Service Interruption – Exhaust Fan

On 2/21, Exhaust fan 1 serving rooms 116 & 117 will be shut down to facilitate repairing the flexible duct connector. There will be no exhaust for these rooms. All other HVAC systems will be operational. Thank you for your patience.

2/21: SIRF, Planned Service Interruption – Exhaust Fan

On 2/21, from 7 am to 11 am, Exhaust fan 1 serving rooms 116 & 117 will be shut down to facilitate repairing the flexible duct connector. There will be no exhaust for these rooms. All other HVAC systems will be operational. Thank you for your patience.

2/26: BJC Institute of Health, Farrell Learning and Teaching Center (FLTC), McDonnell Pediatric Research Building, Clinical Science Research Building, Eric P. Newman Education Center, Planned Service Interruption – Fire Alarm System

On 2/26 from 3am to 7am, the facilities team will conduct a fire alarm test of the speakers/strobes. Audible alarms will be heard, and strobes will be visible throughout the building during the test. There will be no need for evacuation. THIS IS ONLY A TEST.

2/14: West Pavilion, Limited Service Interruption – Air Handling Unit

On 2/14 from 6am to 6pm, Facilities will shut down West Pavilion Air Handler Unit 10 to install new motor control devices during the above-noted dates and times. Areas on the ninth and tenth floors may experience cooler or warmer temperatures than normal. Facilities will monitor the area until the unit can be returned to […]

2/26: Southwest Tower, Limited Service Interruption – Air Handling Unit

On 2/26 from 3:30pm to 7:00pm, Facilities will shut down the air handlers serving floors 6 to 8 to allow contractors to complete repairs during the above-noted dates and times. Areas may experience temperatures cooler or warmer than normal. Facilities will monitor the area and place spot-cooler units as needed throughout the floors until the […]