CSRB North Tower Addition-Electric Service Interruption 3/17/2024

The purpose of this outage is to perform maintenance and testing on the ‘W’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘W’ feed. on Sunday, March 17th 3-7 am Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components […]

East McDonnell Facility-Electric Service Interruption 3/13/2024

On Wednesday, March 13th 6-10 am Facilities electricians and contractors will be conducting the inspection and cleaning of the East McDonnell Chiller Switchgear. During this time they will be switching between the D Feed and W Feed for the Chiller Switchgear to allow for the availability of 1 chiller at all times. With D-Feed being […]

McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 2/14/2024

On Wednesday, February 14th from 4 am to 8 am we will be performing preventative maintenance for Air Handling Unit #2 and exhaust fans for the 562A-BSL3 in the McDonnell Medical Sciences building. During this outage there will be limited temperature control and supply air flow and exhaust flow to 562A-BSL3 lab. NO WORK SHALL […]

CSRB North Tower Addition-Electric Service Interruption 3/10/2024 3-7 am

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]

Steven & Susan Lipstein BJC Institute of Health-Chilled Water Service Interruption 2/16-18/2024

Facilities will be assisting contractors with draining the chilled water for the entire building. No chilled water will be available from 11:00 pm February 16th to 10:00 AM February 18th. This will affect all systems that use chilled water. Temperatures in the building will be warmer than normal in some areas. Temporary cooling will be […]

CSRB North Tower Addition-Electric Service Interruption 3/10/2024 – 7-11 am

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]