On Friday, October 3, 4-6 am, facilities, along with contractors, will be conducting upgrades to the electrical system. A power transfer will be necessary. We do not anticipate any blips or power loss during the process.
On Friday, October 3, 4-6 am, facilities, along with contractors, will be conducting upgrades to the electrical system. A power transfer will be necessary. We do not anticipate any blips or power loss during the process.