Exhaust fan 8 will be shut down to assist the contractor working on the 9th floor construction project to replace the ductwork serving the exhaust fan. Areas affected are as follows. 2nd floor room 252B, fume hood 252-1, Fume hood 251-2. 3rd floor rooms 356, 360B, and Fume hood 355. 4th floor rooms 455, 458, […]
Category: Outages
Clinical Sciences Research Building-Elevator Service Interruption 4/10-16/2025
Elevator #10 is out of service for repairs. Once the repair parts are installed, the elevator will be returned to service.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 4/18/2025
On Friday, April 18th 4-7 am, facilities technicians and contractors will be working on preventative maintenance and repairs to the HVAC systems serving floors 7-11 of the vertical expansion. The supply and exhaust air to the 7th-floor BTCF and the exhaust air to all spaces on the 7-11 expansion will be affected. Please cap any […]
Couch Biomedical Research Building, Bernard Becker Medical Library, North Medical Building-Electric Service Interruption 4/29-30/2025
Elevators in the listed buildings will be out of service for testing on emergency generator power from 6 am to 7 am each day, starting on April 29 and continuing through April 30. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. […]
Couch Biomedical Research Building, Bernard Becker Medical Library-Elevator Service Interruption 4/28/2025
Elevators in the listed buildings will be out of service for 2 to 3 hours, from 3:00 pm to 7:30 pm on April 28th, to complete the 5-year fire recall testing as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a priority basis, depending […]
Couch Biomedical Research Building, Bernard Becker Medical Library, 4444 Forest Park Ave., Taylor Avenue Building, North Medical Building, Biotechnology Center, East Imaging Center, 620 S Taylor-Elevator Service Interruption 4/28-5/2/2025
Elevators in these buildings will be out of service for 2 to 4 hours between 7:00 am and 3:30 pm from April 28th to May 2nd. This is to conduct annual and 5-year inspections as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a […]
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 4/10/2025
On Thursday, April 10th 4-7 am, facilities technicians will be performing repairs to the supply air handler that serves the wet lab spaces, including all BSL3 labs in the building. During this outage, NO work shall occur in BSL3 suites 7301, 7303, 7230, 8201, or 8210.
McDonnell Pediatric Research Building, McDonnell Medical Sciences Building-Electric Service Interruption 4/15-16/2025
Elevators in the listed buildings will be out of service for testing on emergency generator power from 6 am to 7 am each day, starting April 15th, through April 16th. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. The following list […]
Steven & Susan Lipstein BJC Institute of Health, McDonnell Pediatric Research Building, 4533 Clayton Ave, 4488 Forest Park, McDonnell Medical Sciences Building-Elevator Service Interruption 4/14-18/2025.
Elevators in these buildings will be out of service for approximately 2 to 4 hours between 7:00 am and 3:30 pm on April 14th through April 18th to conduct inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a […]
Steven & Susan Lipstein BJC Institute of Health-Gas Service Interruption 4/5/2025
On Saturday, April 5th, from 6 am – 12 pm, facilities will shut off the natural gas to the building to repair a gas leak on the riser of the 11th floor of the building.