On Monday, May 8th from 6 am to 9 am Air handling unit one for the South Medical Building will be off to finish upgrades to the unit. In this time frame there will be little to no heating/cooling capabilities and air flow to the first floor.
Category: Outages
CSRB North Tower Addition-BSL3 Lab 452/462 Service Interruption 5/10/2023
In order for facilities to replace lamps BSL3 lab 452/462 will be out of service during the above-noted time. During this time NO work shall take place in the lab.
Genome Data Center-Electric Service Interruption 5/20/2023
On Saturday, May 20th 6 am – 5 pm Facilities/Contractors will be making a repair to one of the output wires for UPS – 7W on the East side of the Genome Data Center, they will also be testing the other wires in the same wire tray. To complete this work, we will be powering […]
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 5/18/2023
On May 18th 8 pm-12:00 am facilities technicians will be performing preventative maintenance on the air handling units serving the lower-level vivarium including the BSL3 suites. The lower level should experience no change in temperature or airflow however, out of an abundance of caution NO work shall take place in the B120 BSL3 suite.
UPDATED-CSRB North Tower Addition-Air Handling Unit 5/17/2023
On Wednesday, May 17-18 8 pm – 12 am Facilities Technicians will be performing preventive maintenance on the air handling and exhaust systems for the 4th and 5th floor. During this time occupants may experience a slight rise in temperatures in the common space areas. To ensure safety all BSL3 labs on the 4th floor […]
Specialized Research Facility East-Elevator Service Interruption 5/3-4/2023
Elevator #82 will be out of service until further notice for inspection and testing needs.
McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 5/13-22/2023
To improve the exhaust system and reduce the risk of unplanned failure, Facilities Technicians will replace motors serving the BSL3 suite 8201. To complete this work there will be a series of outages needed. The outages will follow the schedule below. During the times noted there shall be NO work allowed in BSL3 suite 82015/13 […]
Couch Biomedical Research Building-Electric Service Interruption 5/1-5/2023
Facilities and Contractors will be working on running a new power source to the Cold Rooms on the 1st Floor of the Couch building on May 1-5. During this time, work will be performed in the Hallway/Corridor (RM. 1116, RM. 1110, and RM.1101) along with the cold rooms. The power will be off to each […]
Northwest Tower-Elevator Service Interruption 4/30/2023-5/3/2023
The elevators in Northwest tower are operating in emergency dispatch mode until further notice. This means that the elevators will operate continuously, stopping at random floors going up then back down. For example: Going up an elevator may stop at all the odd numbered floors, then coming down it will stop at even numbered floors. […]
Southwest Tower-Fume Hoods Service Interruption 5/6/2023
Facilities will be making repairs to fume hoods that are located on floors six, seven, and eight. No work should be done in the lab area fume hoods on Saturday, May 6th 6 am – 12 pm. The BTCF area will not be affected by this outage.