Starting May 21st @ 6:00 pm the Air Handler that serves the entire 1st floor and the north section of the 2nd and 3rd floor will be down until 2:00 am for inspections. During normal working hours, the Air Handler will be operational but will be taken down again on May 22nd from 6:00 pm […]
Category: Outages
CSRB North Tower Addition-Elevator Service Interruption 5/21/2025
Elevators in this building will be taken out of service, one at a time as needed, to conduct fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. Each elevator will be returned to service once it is tested.
Jeffrey T. Fort Neuroscience Research Building-Steam Service Interruption 5/24-25/2024
This steam outage is needed to make modifications and repairs to the main steam station coming into the building. During May 24th 5 pm – May 25th 5:30 am there will be minimal heat being generated by our back up heating equipment. THIS HEAT WILL BE PROVIDED TO CRITCAL AREAS ONLY. All offices, labs, cagewash, […]
4480 Clayton-Electric Service Interruption 6/15/2024 6 am – 2 pm
The impact of this outage will affect lighting, receptacles, building equipment, pumps, HVAC. Emergency Power will supplied during the total outage.
Mallinckrodt Institute Radiology-Elevator Service Interruption 6/2/2024
Elevator 103 will be out of service on Sunday, June 2nd, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
Revised-Mallinckrodt Institute Radiology-Elevator Service Interruption 6/23/2024
Elevator 102 will be out of service on Sunday, June 23rd, at 8 AM for 4 hours to perform the 5-year inspections as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevator will be back in service at noon.
Cancer Research Building, South Medical Building-Electric Service Interruption 6/9/2024 7 am – 11 am
The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the Courtyard Substation switchgear. Facilities electricians will perform switching in all affected buildings, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized […]
East Imaging Center-Air Handling Unit Service Interruption 5/24/2024
On May 24th from 12:30 pm to 2 pm Air handlers 1B serving the first floor and 2-3 serving the second and third floor of the East Imaging Building will be down for inspections. In this time there will be limited to no heating or cooling and airflow to all floors in the building.
East Imaging Center-Air Handling Unit Service Interruption 5/24/2024
On May 24th from 2 pm to 3:30 pm Air handlers B1 and B2 serving the basement of the East Imaging Building will be down for inspections. In this time there will be limited to no heating or cooling and airflow to the basement of the building.
Clinical Sciences Research Building-Heating Hot Water Service Interruption 5/18/2024
On Saturday, May 18th 6 am – 2 pm Facilities will be turning off the heating hot water for the entire building. Temperatures for the air handlers will be raised to help maintain warmer temperatures. Temperatures in the building may be cooler than normal during this time.