3/14: SRF + East, Planned Service Interruption – Air Handling Unit
On 3/14 from 7 am to 7 pm, Air Handler 1 will be shut down to facilitate the installation of a new air filter system. This will affect the Cage wash areas, office spaces, and general areas on the 1st floor. Animal spaces will not be affected. Thank you for your patience.
3/9: Eric P. Newman Education Center, Limited Service Interruption – Building Heat
Technicians have identified a leak in the building’s heat system and are working to repair it. Temperatures may vary throughout the building.
3/14: McMillan, Planned Service Interruption – Chilled Water
Facilities will drain the chilled water in the building to assist contractors with upgrading the system. On 3/14 from 4 am to 6 pm, facilities will place supplemental spot coolers in certain areas and monitor other areas as needed. Customers may notice warmer-than-normal temperatures during these times.
3/18: McDonnell Medical Science Building, Planned Service Interruption – Electric
On 3/18, from 6 am to 11 am, facility electricians and contractors will conduct electrical inspections on the building switchgear “W” sub. We do not anticipate any power loss or blips during the maintenance inspection.
3/19: McDonnell Medical Science Building, Planned Service Interruption – Electric
On 3/19 from 6 am to 11 am, facility electricians, along with the contractor, will conduct an electrical maintenance inspection of the building switchgear USS2 “D”. We do not anticipate any power loss or blips during the inspection period.