12/12: McMillan Hospital – Air Handling Unit Interruption
To assist with repairs, Facilities will shut down the air handling unit serving floors 1-5 on December 12th from 5am to 7am. Occupants on these floors may notice cooler-than-normal temperatures during this period.
12/10: CSRB North Tower Addition – Air Handling Unit Interruption
On December 10th, from 5am to 6:30am, facilities technicians will be troubleshooting HVAC systems serving the 4th- and 5th-floor labs. Out of an abundance of caution during this time, NO work shall be conducted in the 4th-floor labs.
12/10: McMillan Hospital – Exhaust Fan Interruption
On December 10th, from 5am-6am, facilities will shut down the lab exhaust system serving all wet labs and fume hoods in the building. During this time, no work will be allowed in the fume hoods.
12/23: Biotechnology Center – Freezer Interruption
On December 23rd, from 7am to 3pm, Freezer 310A will be shut down to aid the contractor in the door replacement.
12/15: CSRB North Tower Addition – Service Interruption
On December 15th, from 6:30am-8am, facilities plumbers will be troubleshooting/ repairing the eyewash in BSL3 lab suite 426. During this time, NO work shall be conducted in the BSL3 lab suite 426.