Steven & Susan Lipstein BJC Institute of Health- HVAC Service Interruption 12/16-18/2025
During the dates and times noted below, facilities technicians will perform preventive maintenance on the HVAC systems serving the 11th Floor ABL and B120 BSL3 suite. During this maintenance window, NO work may be conducted in the ABL or B120 suites, as outlined in the schedule below. Please ensure all activities are suspended, and the […]
CSRB North Tower Addition-HVAC Service Interruption 12/17-18/2025
During the dates and times noted below, facilities technicians will perform preventive maintenance on the HVAC systems serving the 4th-floor BSL3 labs. During this maintenance window, NO work may be conducted in the 4th-floor BSL3 labs. Please ensure all activities are suspended, and the space is vacated before the start of the outage.12-17 4:30 AM […]
Biotechnology Center-Exhaust Fan Service Interruption 12/20/2025
Facilities will be shutting down all exhaust fans during this outage to facilitate the contractor in running a new electrical circuit. All fume hoods and building exhaust will be affected. During this time there should be no work performed within all fume hoods. Thank you for your patience.
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/21/2025
Elevator 103 will be out of service on Sunday, December 21st, from 8:00 AM to 12:00 PM for preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption
Elevator 102 will be out of service on Sunday, December 7th, from 8:00 AM to 12:00 PM for preventive maintenance. It will be back in service at noon.