On Tuesday, January 30th 5-8 am Facilities will turn off the air handler that serves the office spaces on the south side of the building to perform preventive maintenance. The offices on floors 2 through 12 will experience loss of airflow and cooler-than-normal temperatures.
News
McDonnell Pediatric Research Building-7303 BSL3 Suite Service Interruption 1/20/2024
In support of the 7301 BSL3 suite bubble-tight damper replacement project, the 7303 BSL3 suite will be unavailable on Saturday, January 20th 6-6:30 am during this brief outage as a precautionary measure while the 7301 systems are adjusted in preparation to replace the bubble-tight damper serving 7302-BSL3 lab.
McDonnell Pediatric Research Building-7303 BSL3 Suite Service Interruption 1/20/2024
In support of the 7301 BSL3 suite bubble-tight damper replacement project, the 7303 BSL3 suite will be unavailable on Saturday, January 20th 6 am during this brief outage as a precautionary measure while the 7301 systems are adjusted in preparation to replace the bubble-tight damper serving 7302-BSL3 lab.
McDonnell Pediatric Research Building-CO2 Service Interruption 1/18/2024
On Thursday, January 18th 6-9 am CO2 service to 7302-BSL3 lab will be down temporarily to reroute the CO2 piping in the corridor that serves this BSL3 suite.
We Proudly Serve Starbucks Program at Farmstead Café started January 8th
Beginning January 8th, Bon Appetit launched the We Proudly Serve Starbucks program in the Farmstead Café. The menu includes handcrafted, blended and espresso offerings, as well as iced teas and refreshers. Stop by the café Monday-Friday, 7:00am-4:00pm to see the changes made in the café and grab your morning or afternoon pick-me-up. For any questions, […]
McDonnell Pediatric Research Building-7301 and 7303 BSL3 Suites Service Interruption 1/27/2024
On Saturday, January 27th 6 am – 6 pm Johnson Controls will be replacing the obsolete network control engine that serves the 7301 and 7303 BSL3 suites. NO work may occur in the 7301 and the 7303 BSL3 suites during this outage.
Clinical Sciences Research Building-Air Handling Unit Service Interruption 1/20/2024
On Saturday, January 20th 6-9 am contractors will be working on the ductwork that serves the south side of the 7th floor. The south side of the 7th floor will experience loss of airflow and slightly cooler than normal temperatures during this time.
McDonnell Pediatric Research Building-Fire Alarm Service Interruption 1/24/2024
On Wednesday, January 24th 9 am -12 pm WUSM Facilities will be testing the Audio/Visuals for the fire system to complete a city inspection. During this time you will hear messages and see strobes throughout the building. No additional equipment will be affected during this outage. Occupants do not need to leave the building during […]
BJC Institute of Health vertical expansion – Wohl Circle closure extended through June 2024
To accommodate the BJC Institute of Health Vertical Expansion construction work, the Wohl Circle closure is being extended through June 2024. Please see the diagram. If your work on campus takes you in or around the BJC IOH building and Hope Plaza, please anticipate shutdowns, disruptions and inconveniences associated with the construction of this project. […]
McDonnell Pediatric Research Building-HVAC Service Interruption
On Saturday, January 20th and January 27th from 6 am to 6 pm BSL3 lab suite MPRB 7302 will be out of service so facilities can perform improvements to the HVAC safety system of the lab. During these times NO work shall be conducted within BSL3 lab suite 7302.