On 2/21, Exhaust fan 1 serving rooms 116 & 117 will be shut down to facilitate repairing the flexible duct connector. There will be no exhaust for these rooms. All other HVAC systems will be operational. Thank you for your patience.
News
2/21: SIRF, Planned Service Interruption – Exhaust Fan
On 2/21, from 7 am to 11 am, Exhaust fan 1 serving rooms 116 & 117 will be shut down to facilitate repairing the flexible duct connector. There will be no exhaust for these rooms. All other HVAC systems will be operational. Thank you for your patience.
3/4: 4560 Clayton (Research Building), Planned Service Interruption – Building Heat
On 3/4, from 6 am to 10 am, the Heating Hot Water system serving the second floor will be shut down to facilitate a contractor to repair a leaking pipe. There will be no heating available during the outage. All other HVAC systems on the floor will continue to operate as designed. Thank you for […]
2/28: Cancer Research Building, Air Handling Unit – Planned Service Interruption
On 2/28 from 6am to 6pm, Air Handler 1 will be shut down to install a new air filter system. There will be no heating, cooling, or airflow to the 4th, 5th, and 6th floors. Thank you for your patience.
2/26: East Building, Mid Campus Center, Metro Garage, Becker Medical Library, West Building, Planned Service Interruption – Fire Alarm System
On 2/26 from 3pm to 7pm, the facilities team will conduct a fire alarm test of the speakers/strobes. Audible alarms will be heard, and strobes will be visible throughout the building during the test. There will be no need for evacuation. THIS IS ONLY A TEST.
2/26: BJC Institute of Health, Farrell Learning and Teaching Center (FLTC), McDonnell Pediatric Research Building, Clinical Science Research Building, Eric P. Newman Education Center, Planned Service Interruption – Fire Alarm System
On 2/26 from 3am to 7am, the facilities team will conduct a fire alarm test of the speakers/strobes. Audible alarms will be heard, and strobes will be visible throughout the building during the test. There will be no need for evacuation. THIS IS ONLY A TEST.
Reminder: How to Place Work Orders in ServiceNow for Facilities Services
As a reminder, the Facilities Integrated Service Center (FISC) is the central point of contact and processing for facilities work orders at WashU Medicine. The center serves as a liaison between campus customers, service providers, emergency responders, and business managers. They offer a variety of business services, including new employee badges, parking, and Metro cards (U-Passes). More […]
2/19-20: McKinley Avenue Sidewalk Closure
From February 19-20, Staat Masonry will replace one stone on the lower band on the south side of the McDonnell Medical Sciences Building off of McKinley Avenue. While work is in progress, a small section of the concrete sidewalk will be closed to allow room for ADA access and pedestrian traffic. Precautions will be taken […]
2/16-4/1: 4444 Forest Park 1st Floor Lobby and Corridor Renewal
From February 16 to April 1, the first-floor lobby and corridor of 4444 Forest Park will undergo a renovation. Work will be done during off-hours (6 p.m. to 7 a.m.). No actual closures will take place. The scope of the work includes painting, flooring updates, ceiling tile replacement, and the installation of new lobby furniture. […]
2/16-3/13: Clinical Science Research Building, Limited Service Interruption – Air Handling Unit, Other
As part of the ongoing supply air duct restoration project, contractors will be working above the ceilings in the hallways on the CSRB 10th Floor South. Work will be performed each night between 5 am and 6 pm. During this time, the air handler serving the 10th Floor South will be shut down. The contractors […]