On Sunday, February 23rd, from 12 to 8 am, the building will have limited hot water and decreasing hot water temperature. Please DO NOT use showers or cage wash machines during this time.
News
East McDonnell Facility-Electric Service Interruption 3/22/2025
On Saturday, March 22nd, 7-11 am, facilities, and contractors will be conducting electrical maintenance on the building “D” feeder. The maintenance will consist of half the building being de-energized to perform necessary testing. There will be a loss of normal power to lighting from the basement to the fourth floor, MCC-5, and some receptacles from […]
East McDonnell Facility-Electric Service Interruption 3/15/2025
On Saturday, March 15, from 7 to 11 am, facilities and contractors will conduct electrical switchgear maintenance on the building’s “W” feeder. The maintenance will consist of half the building being de-energized to perform necessary testing. There will be a loss of normal power to receptacles basement levels to third fl., lighting from fifth floor […]
Northwest Tower-Electric Service Interruption 3/8/2025
On Saturday, March 8th, 7-11 am, facilities and contractors will conduct electrical switchgear maintenance for floors 6 through 8; standard power will be de-energized; however, emergency power will be available during the outage. This means that all emergency outlets (RED) will be restored once the generator starts up. The affected devices are as follows: receptacles, […]
Steven & Susan Lipstein BJC Institute of Health-Electric Service Interruption 2/25/2025
During the time and date above facilities along with contractors will be conducting an outage to upgrade stand-alone AHU on the 7th fl. from normal power to emergency power. The affected rooms are as follows: 0711-1, 0711-2, 0713, 0715, 0716, 0717, 0718.
CSRB North Tower Addition-Electric Service Interruption 3/6/2025
On Thursday, March 6th, from 4-6 am, the emergency lighting circuit for the NTA elevator lobbies will be shut off to reconnect the 7FL new emergency lighting and disconnect the 10FL emergency lighting for replacement.
CSRB North Tower Addition-Electric Service Interruption 2/20/2025
On Thursday, February 20th from 4-6 am, the emergency lighting circuit for the NTA elevator lobbies will be shut off to reconnect the 4FL new emergency lighting and disconnect 7FL emergency lighting. This emergency circuit impacts BSL-3 lab lighting on the 4FL. NO work may occur in the 4th floor biohazard area during this outage.
CSRB North Tower Addition-Electric Service Interruption 3/6/2025
On Thursday, March 6th from 4-6 am, the emergency lighting circuit for the NTA elevator lobbies will be shut off to reconnect the 7FL new emergency lighting and disconnect the 10FL emergency lighting for replacement.
New gas line installation at the Jeffrey T. Fort Neuroscience Research Building starts on Monday, February 17th
Spire will begin work on a new gas line at Jeffrey T. Fort Neuroscience Research Building (4370 Duncan Ave) on Monday, February 17th. Underground work is scheduled for completion by Friday, February 21st. Additional installation work, including the gas meter, will occur the week of March 3rd. Construction & Traffic Impact: Location: Near the Newstead […]
Central West End MetroLink elevator out of service
Sent on behalf of Metro. Starting Monday, February 17th, the elevator at the Central West End MetroLink station will be out of service until the necessary replacement parts arrive. Metro will run a shuttle from 7 am to 6 pm Monday to Friday. After hours, please call 314.982.1505 and press #2 for assistance.If you have […]