The supply fan motor in the upper air tunnel of AHU-2 will be replaced.
CSRB North Tower Addition-Entry Door Lab 465/455 Service Interruption 3/12/2024
On Tuesday, March 12th 8-10 am a door technician will be repairing/ troubleshooting the operation of the entry into door into lab 465/455. During this time NO work shall take place inside lab 465/455.
CANCELED-Mallinckrodt Institute Radiology-Elevator Service Interruption 3/24/2024
Elevator 103 will be out of service on Sunday, March 24, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
South Medical Building-Cold Room 2914 Service Interruption 2/20/2024-2/23/2024
On February 20th from 12:30pm to February 23rd at 4:30pm cold room 2914 in the South Medical Building will be down for repairs. At this time there should be nothing stored in this cold room.
Crane lift at the Farrell Learning & Teaching Center (FLTC)/Power Plant on Saturday, February 17th
On Saturday, February 17th, a crane will be set up between 6 and 7 am, and the actual lift will be a few hours. Please allow a 6 am to noon window for the complete operation. This crane will lift equipment to the roof of FLTC in support of the Multi-Disciplinary Surgical Simulation Lab currently […]
Ambulatory Cancer Building lane closure on Forest Park Avenue started yesterday (February 14)
Yesterday, February 14th, a crane to remove the buck hoist exterior construction elevator was set up with its outriggers within the southeastbound lane of Forest Park. This lane will be closed from 6 am – to 3 pm for a distance of about 40 feet during the rest of this week. On Monday, February 19th, […]
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 2/22/2024
On Thursday, February 22nd 5-8 am Facilities will turn off the air handler serving the pedestrian link and administration offices for the south section of the building for maintenance. The pedestrian link along with the administration offices located on floors 3 through 11 will experience loss of airflow and cooler-than-normal temperatures during the above-noted dates […]
CSRB North Tower Addition-Fire Alarm Service Interruption 2/29/2024
On Thursday, February 29th 3-6 am In preparation of the upcoming NTA fire alarm upgrade project, the OFMD fire alarm crew will be completing some work on the existing fire alarm system that serves the supply air units serving the 4th floor biohazard area. As a precautionary measure, no work may occur in the 4th […]
REVISED-Jeffrey T. Fort Neuroscience Research Building-Exhaust Fan Service Interruption 2/23/2024 3:30 am-6 am
We plan to reduce to minimum the airflow supply and exhaust on units that serve level 3 through level 10 open labs/offices/vertical vivarium (not including level 10 primate holding and OR areas). Spaces served by this equipment should still experience limited air changes – though not necessarily consistent throughout and room pressure monitors may go […]
Jeffrey T. Fort Neuroscience Research Building-Exhaust Fan Service Interruption 3/1/2024 3:30 am- 6:00 am
We plan to reduce to minimum the airflow supply and exhaust the units that serve level 10 primate holding and OR areas. Spaces served by this equipment should still experience limited air changes—though not necessarily consistent throughout and room pressure monitors may go into alarm. Expect the exhausted fume hoods will alarm and should not […]