Western Specialty Contractors will be repairing sections of the North Building cornice and wall in the FLTC Lobby from December 8 to December 19. The required specialty lift will be delivered on December 8 and may require a short interruption of the FLTC Lobby west sliding doors to bring the lift into the space. Areas […]
December 2-9: Bon Appetit Pop Up Café – Fort Labs (NRB) Café
Bon Appétit will be operating a Pop Up Café in the Fort Labs Café, 3rd Floor, from Tuesday, December 2 to Friday, December 9. They will operate Monday-Friday, 7 a.m. to 3 p.m., offering grab-n’-go items and a rotating selection of in-café specials. Kaldi’s will be offering a complimentary Spiced Oat Milk Cold Brew Latte, […]
November 3 – April 2026: Plaza Entry Project to Close Corridor Intersection, Two Detour Options Beginning November 10
Sent on behalf of Barnes-Jewish Hospital. As renovations continue on the main level lobby at BJH South, work will begin on a busy corridor intersection. Contractors will partially block the area starting November 3 as they erect construction barriers. They plan to completely close the area on November 10 for approximately 5 months. Detour routes […]
DELAYED: Clinical Sciences Research Building (CSRB) Bicycle Parking Area Will Close
UPDATE: The closure of the CSRB Bicycle Parking Area has been delayed. Cyclists may continue using this parking space until further notice. Earlier story: The CSRB Bicycle Parking Area will be closed for use starting on December 15 due to construction in that space. All of the fencing and bike racks will be removed from the […]
December 1-17: Medical Campus Street Work Notification on Clayton, Duncan, and Newstead Avenues
Sent on behalf of Barnes-Jewish Hospital. Beginning December 1, Kaemmerlen Electric will be working on the Medical Campus to remove cables along Clayton (4200-4500 block), Duncan (4400 block), and Newstead (200 block) Avenues. Weather permitting, the planned duration of this work is from December 1 to December 17. All work will be done during the day […]
Steven & Susan Lipstein BJC Institute of Health- HVAC Service Interruption 12/16-18/2025
During the dates and times noted below, facilities technicians will perform preventive maintenance on the HVAC systems serving the 11th Floor ABL and B120 BSL3 suite. During this maintenance window, NO work may be conducted in the ABL or B120 suites, as outlined in the schedule below. Please ensure all activities are suspended, and the […]
CSRB North Tower Addition-HVAC Service Interruption 12/17-18/2025
During the dates and times noted below, facilities technicians will perform preventive maintenance on the HVAC systems serving the 4th-floor BSL3 labs. During this maintenance window, NO work may be conducted in the 4th-floor BSL3 labs. Please ensure all activities are suspended, and the space is vacated before the start of the outage.12-17 4:30 AM […]
Biotechnology Center-Exhaust Fan Service Interruption 12/20/2025
Facilities will be shutting down all exhaust fans during this outage to facilitate the contractor in running a new electrical circuit. All fume hoods and building exhaust will be affected. During this time there should be no work performed within all fume hoods. Thank you for your patience.
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/21/2025
Elevator 103 will be out of service on Sunday, December 21st, from 8:00 AM to 12:00 PM for preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption
Elevator 102 will be out of service on Sunday, December 7th, from 8:00 AM to 12:00 PM for preventive maintenance. It will be back in service at noon.