WashU Medicine students, faculty, and staff are invited to get their bikes tuned up for free on October 2, from 10 a.m. to 1 p.m. Tune-ups cover basic maintenance and are first-come, first-served. You can learn more about the event and sign up on the website. If you have any questions, please contact Jenna Schaefer, […]
McDonnell Pediatric Research Building-Network Control Engine Service Interruption 9/29/2025
On Monday, October 29, 12:05-1:00 pm . A network control engine that serves the lab supply and exhaust air units needs to be reset and the battery replaced on the engine. As a precautionary measure, no work may occur in the BSL3 suites (7230, 7301, 7303, 8201, 8210) during this outage.
Gary C. Werths Siteman Cancer Center-Fire Alarm Service Interruption 10/15/2025
On Wednesday, October 15, 5-7 am, facilities along with contractors will be conducting a test of the fire alarm system; there will be audible and strobing soundswitnessed during this test. There will be no need for evacuation.
Gary C. Werths Siteman Cancer Center-Air Handling System Service Interruption 10/26/2025
On Sunday, October 26th, 5 am – 4 pm, facilities along with contractors will be conducting a test test of the duct detectors in the air handling system.
4533 Clayton Ave-Elevator Service Interruption 10/2/2025 9 am – 3 pm
Elevator #86 will be intermittently out of service to allow the replacement of its associated fire alarm devices. Once the work is completed and tested, the elevator will be returned to service.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit 10/20-24/2025
To facilitate improvements to the HVAC system serving the lower level vivarium and the B120 BSL3 suite, Facilities will be conducting a series of planned outages during the following dates and times:October 20 – 5:00 AM to 7:00 AMOctober 21 – 5:00 AM to 7:00 AMOctober 22 – 5:00 AM to 7:00 AMOctober 23 – […]
Irene W Johnson Institute Rehab-Exhaust Fan Service Interruption 10/10-13/2025
Between October 10, 3 p.m. and October 13, 7 a.m. Facilities will be assisting contractors in shutting down the exhaust system that serves fume hoods 402, 404, and 406 to install ductwork modifications. During the specified dates and times, no work in the fume hoods will be allowed.
Steven & Susan Lipstein BJC Institute of Health-Gas Service Interruption 9/24-25/2025
At approximately 2:45 PM on Wednesday, September 24, facilities were notified of a gas leak in the 10th-floor vertical expansion. By 3:30 PM, facilities located the leak and isolated it. Repairs will be completed and gas service will be restored by 7:00 AM on Thursday morning. During the noted times, any appliances utilizing gas will […]
Steven & Susan Lipstein BJC Institute of Health-Exhaust Fan Service Interruption 9/25/2025
On Thursday, September 25, from 4:00 to 7:00 a.m., testing will be completed on the exhaust fans serving the Vertical Expansion wet labs, including the BTCF facility. Exhaust air to the Vertical Expansion wet labs will be intermittently shut off during the outage. Avoid using fume hoods in the Vertical Expansion during the outage times […]
Clinical Sciences Research Building-Elevator Service Interruption 10/27/2025
The elevators will be taken out of service on Monday, October 27, between 6 pm and 10 pm for final inspection of the fire recall function on the new fire alarm system. The elevators will be returned to normal service by 10 pm.