Crane operations for the East Imaging project will close a section of Scott Avenue on September 20-21, September 27-28 and October 13-14. Scott Avenue will be closed at each end of the food truck lane, and the food truck lane will be used to divert any traffic needing to access Scott Avenue. If you have […]
September 18: Get Ready to Tour Plaza West Tower
Sent on behalf of Barnes-Jewish Hospital. Get in on the excitement! Come and get your sneak peek of the new Plaza West Tower before it is officially activated. Learn more about the new building and download the move schedule. Take a tourTours will be offered on Thursday, September 18, at three different times during the […]
September 15: Barnes-Jewish Hospital Second Floor Corridor Restriction Begins, a 15-New Donor Wall Feature to be Installed
Sent on behalf of Barnes-Jewish Hospital. Donor recognition will be reimagined in the second-floor corridor when a new installation is unveiled in November. In the meantime, some work to prepare the corridor will begin on September 15. Contractors will start by installing barriers on both sides of the corridor. Then they will remove the current […]
September 8-18: Spire Road Closure – Clayton and Taylor Avenues Intersection
Sent on behalf of Spire. Spire’s work at the Clayton and Taylor Avenue intersection will continue to cause significant impacts to traffic until Thursday morning. Spire will be closing off the south and west sides of the intersection during business hours through Thursday morning. Vehicles coming eastbound towards Taylor Avenue will be forced to either […]
Steven & Susan Lipstein BJC Institute of Health-Electrical Service Interruption 9/24/2025 and 9/25/2025
To perform preventive maintenance, facilities will conduct two outages on the dates and times noted below. During this time, NO work shall be conducted in BSL3 suite B120.9/24 5 am – 7 am9/25 5 am – 7 am
CSRB North Tower Addition-Electrical Service Interruption 9/23/2025 and 9/24/2025
To facilitate essential preventative maintenance, Facilities will conduct two scheduled outages on the dates and times listed below: Monday, September 23 – 4:00 AM to 6:00 AMTuesday, September 24 – 4:00 AM to 6:00 AM During these periods, NO work is permitted within any 4th floor ABSL3/BSL3 suite. Additionally, occupants on the 4th and 5th […]
Jeffrey T. Fort Neuroscience Research Building-Elevator Service Interruption 9/24-25/2025
Elevators 147–148 in NRB will be taken out of service to allow Midwest Elevator to perform necessary repairs. Each elevator will be out of service one at a time between 6:00 a.m. and 4:30 p.m. The repair schedule is as follows:
Jeffrey T. Fort Neuroscience Research Building-Elevator Service Interruption 9/16-19/2025
Elevators 143–146 in NRB will be taken out of service to allow Midwest Elevator to perform necessary repairs. Each elevator will be out of service one at a time between 6:00 am and 4:30 pm. The repair schedule is as follows:
McDonnell Pediatric Research Building-BSL3 Suite 8201 Service Interruption 9/15/2025
On Monday, September 15, 7:30-9:30 am, facilities technicians will be troubleshooting an electrical issue in the BSL3 suite 8201. During this time, NO work shall be conducted in the 8201 BSL3 suite.
REVISED-McDonnell Medical Sciences Building-Exhaust Fan 9/19-20/2025
On Friday, September 19, at 3 pm, through Saturday, September 20, at 2:30 pm, exhaust fan 36 will be shut down to assist contractors in replacing it with a new exhaust fan for the 9th-floor construction project. This will affect all bathroom exhaust in the entire facility. This outage will affect fume hoods 820A, 820B, […]