Facilities Operations Update

MDAS Project (Group A COH Building) Cutover Communication

Sent on behalf of Barnes-Jewish Hospital.

The greater portion of the MDAS (in-building cellular system) infrastructure construction has been completed for the buildings listed below. On Sunday, July 25th On Air Solutions (OAS) will “turn down” the existing “Sprint Only” in-building cellular system and “turn up” the new MDAS; the existing Sprint in-building cellular system will experience a 60-minute service interruption between 12pm-1:00pm. The new in-building cellular system will continue to provide Sprint/T-Mobile coverage.

On Air Solutions, and the Cellular Carriers will continue work in the designated buildings although the corridor cabling work is complete perimeter walks will occur to test and optimize the new system.

Outage Date/Duration:

• Sunday, July 25,2021 – 12pm-1pm

Impacted Areas:
• COH Building (all floors)
• Proton Therapy
• North Garage Dock Area

Service Impacted:
• Sprint

Contractors Onsite:
• On Air Solutions

Contractors On-call:
• ArchKey

Contact Information:
Paul Stodgell-314-496-7709