Outages

Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit 12/6/2021-12/17/2021

In support of the B120 controls upgrade project, the supply and exhaust air handling units serving the basement vivarium including will be intermittently shut down as part of the failure mode testing of the B120 ABSL3 suite. There will periods of intermittent loss of airflow to the vivarium including the B120 ABSL3 suite that will temporarily affect vivarium space pressures but little impact on space temperature and humidity.

The outage will begin each evening at 9:00 PM and end at 6:00 AM the following morning. No work may occur in the B120 ABSL3 suite during these outage times.