Outages

Mallinckrodt Institute Radiology, BJHS Rand Johnson-MIR elevator lobby from the Rand Johnson hallway closed 10/10/2022 6 am-10/19/2022 4 pm

The 1st floor vestibule that leads to the MIR elevator lobby from the Rand Johnson hallway will be shutdown for fire shutter maintenance and the addition of new fire doors during the above listed dates and times. Alternate access to the elevator lobby is available via the stairwell located around the corner. Containment barriers and directional signage will be present during the outage. Due to unforeseen circumstances, the new fire door installation is taking longer than what was initially anticipated.

We apologize for any inconvenience and are confident that the work will be completed by the end of the business day on the above listed date.