To troubleshoot a motor issue on the air handling unit, supply air will be reduced to the lower level and BSL3 on Wednesday, December 28th 6 am – 7 am. During this time NO work shall be conducted in the BSL3 labs.
To troubleshoot a motor issue on the air handling unit, supply air will be reduced to the lower level and BSL3 on Wednesday, December 28th 6 am – 7 am. During this time NO work shall be conducted in the BSL3 labs.