On Sunday, March 26th 12 am – 5 am contractors will be adding two valves to the pump skid for future isolation. No domestic cold water will be available for vivarium cage washes and all floors six through eleven during this time.
On Sunday, March 26th 12 am – 5 am contractors will be adding two valves to the pump skid for future isolation. No domestic cold water will be available for vivarium cage washes and all floors six through eleven during this time.