Contractors will be making multiple repairs to the air handler that feeds floors 1 through 7. These repairs will be performed March 27-April 2nd during the hours of 8:00 pm to 6 am each night. Floors 1-7 will experience loss of airflow and may see slightly warmer than normal temperatures during the evenings noted above.