Outages

Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 4/16-4/17/2023

Contractors will be working on the air handler that feeds floors 1 through 7 in preparation for cleaning the entire air handler. This air handler will be off at various times throughout April 16th 8 am -17th 6 am. Floors 1 through 7 may experience loss of airflow and slightly warmer than normal temperatures during the evening of April 16th.