CANCELED – McDonnell Pediatric Research Building, Clinical Sciences Research Building, CSRB North Tower Addition, Wohl Clinic, Wohl Hospital, Barnard Hospital, Renard Hospital-Electric Service Interruption 4/24-27/2023

Facilities Electricians will need to perform switching in the CSR-Substation, which provides power to the above listed buildings. This is to support Ameren de-energizing their equipment for maintenance work. During the above listed times, the CSRB Substation will be single lined to one utility, instead of the normal two utilities. We do not anticipate any power interruptions, or blips due to this work. Switching will be scheduled as follows:

  • April 24th, 5am to 6am – Switch to ‘W’ Feed Only
  • April 25th, 5am to 6am – Switch to ‘D’ Feed Only
  • April 26th, 5am to 6am – Switch to ‘W’ Feed Only
  • April 27th, 5am to 6am – Switch to Back to Normal

As a precautionary measure, no work may occur in the NTA 4th floor ABSL3 suites or MPRB BSL3 suites (7230, 7301, 7303, 8201) during this outage.