Outages

Steven & Susan Lipstein BJC Institute of Health 6/5/2023

On Monday, June 5th 4-7 am Facilities will be working on the system that supplies lab air to labs located on floors 7 through 11 as well as the lower level vivarium. No lab air will be available during this time.