On September 23rd 7 am – 3 pm contractors will be working on the air handler that serves floors 5,6, and 7. Floors 5,6 and 7 will experience loss of airflow and warmer-than-normal temperatures during this time.
On September 23rd 7 am – 3 pm contractors will be working on the air handler that serves floors 5,6, and 7. Floors 5,6 and 7 will experience loss of airflow and warmer-than-normal temperatures during this time.