On Thursday, February 15th at 8 am we had a failure to a supply air fan on Air handling unit 1 for the Specialized interim research building. At this time there is 50% of heating, cooling, and air flow for the entire building.
On Thursday, February 15th at 8 am we had a failure to a supply air fan on Air handling unit 1 for the Specialized interim research building. At this time there is 50% of heating, cooling, and air flow for the entire building.