On Saturday, March 16th from 4 am to 4 pm Air handling unit 1 will be off for replacement of bearings at the Specialized Interim Research Building. In this time there will be 50% heating, cooling, and supply air flow to the building.
On Saturday, March 16th from 4 am to 4 pm Air handling unit 1 will be off for replacement of bearings at the Specialized Interim Research Building. In this time there will be 50% heating, cooling, and supply air flow to the building.