On Saturday, June 15th 6 am – 2 pm contractors will be making necessary repairs to the air handler serving the fifth floor. The entire floor may experience warmer-than-normal temperatures during the above-noted dates and times.
On Saturday, June 15th 6 am – 2 pm contractors will be making necessary repairs to the air handler serving the fifth floor. The entire floor may experience warmer-than-normal temperatures during the above-noted dates and times.