Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6am to 7am each day, starting on August 25th, through August 28th. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that follows shows which buildings’ elevators will be tested:
8/25: MIR
8/27: FLTC
8/28: Northwest Tower