On Saturday, September 28th 6 am – 4 pm Facilities will shut off the steam to the entire building. Contractors will be replacing a steam vent on the eighth floor. Temperatures throughout the building may be cooler than normal during this time.
On Saturday, September 28th 6 am – 4 pm Facilities will shut off the steam to the entire building. Contractors will be replacing a steam vent on the eighth floor. Temperatures throughout the building may be cooler than normal during this time.